Showing posts with label RTI. Show all posts
Showing posts with label RTI. Show all posts
RTI Portal Suggestions

RTI Portal Suggestions



On Friday, March 2, 2018 at 4:19:28 PM UTC+5:30, Sanjeev wrote:

Request filed with Department of Personnel & Training
  Contact Details  

Dear Sir,

  1. While uploading reply by PIO an e-mail intimation is sent to applicant informing him that reply has been submitted by department and he may visit the RTI portal to view the reply. The applicant, thereafter has to visit the portal to see the reply. This results in extra action by applicant and also increases the load on portal. However, there is an easy way to fast track this process, that is instead of sending only intimation the system may trigger an email which may contain the reply itself. That will not only help applicant to instantly know the information provided but would also avoid help ease this process.
  2. The special character of "?" is not allowed in the text of application. However, it is felt that many a times "?" is an essential element of text and absence of this does not allow framing of proper questions. The RTI is all about asking questions and without "?" the sentence is incomplete. Therefore, it is requested that this sign may be allowed as part of text.
Regards,
S K Goyal
Information under RTI: Faulty Road Constriction - PWD

Information under RTI: Faulty Road Constriction - PWD



On Thursday, March 15, 2018 at 9:51:46 PM UTC+5:30, Sanjeev wrote:



Registration Number

PWDPT/R/2018/60043

Name

S K Goyal

Date of Filing

15-03-2018

RTI Fee Received

    10

Online Reference Number

201807415397122

Transaction Status

SUCCESS

Request filed with

Public Works Department

 Please refer recent construction of cemented road leading to GB Pant Engineering College from G B Pant Institute of Technology (Okhla).  In this regard please provide following information:



(i)             On this road it has been observed that main holes have not been aligned with the surface level of new road. Please inform whether as per tender specifications main holes were to be aligned with road surface level or not. If yes, how this work has been declared complete.

(ii)            The cemented road is several inches above the previous black road, please inform reasons & facts for not making smooth slope at entry point.

(iii)           Please inform reasons of extreme carelessness of not deputing any one for managing traffic during construction phase,

(iv)          Please inform detail reasons for not deputing any one to clean this stretch on regular basis leading to accumulation of thick layers of dust and causing heavy pollution,

(v)           Please inform reasons of not removing poles located on road while constructing road at the entry gate of Okhla Phase-III (near police post),

(vi)          Please inform reasons & facts for making elevated main holes on the footpath on this road, creating obstruction for pedestrians,

(vii)         What is the standard life of this cemented road,

(viii)        What is the per square meter cost of road,

(ix)            Please provide email, mobile number, telephone number and address of concerned JE, AE & EE.

Telephone Number

23739423

Email Id

Information under RTI: Walkways Maintenance - Dwarka.



On Sunday, December 11, 2016 at 10:54:34 PM UTC+5:30, Sanjeev wrote:

Registration Number
DDATY/R/2016/50788

Name
S K Goyal

Date of Filing
11-12-2016

RTI Fee Received
    10

Payment Mode
Credit or Debit Card / RuPay Card

SBI Reference number
116121131266571

Transaction Status
Transaction Successful

Request filed with
Delhi Development Authority

About Dwarka: Architect Division


In Dwarka there are no slopes at entry & exit point for convenient walking of pedestrians at footpath, at most places height is also more than prescribed 15 CM, no bollards fixed at entry & exit for vehicles to prevent climbing footpath. While this can happen in Connaught Place why not in Dwarka. Are New Delhi Municipal Council engineers are superior than DDA or there is some other problem.

In this back ground please provide to the point information:


1.     It is an error & incompetency on the part of architect division which has designed the walkways?
Or
It is an error and incompetency on the part of civil wing which has constructed these footpaths as per designs provided to them?


2.       In Dwarka we find that at walkways people have carved out ramps. There are 2 types of designs of ramps -  First where slope is contained within the width of footpath  and the Second one where slope starts from the footpath & extends a few feet on adjoining road encroaching on road (refer attached photos mailed to sro...@dda.org.in). Please inform which design is approved & acceptable as per DDA policy?

Telephone Number
011-24631390

Email Id

Information under RTI: Re-circulation of Cash confiscated in Raids.

Information under RTI: Re-circulation of Cash confiscated in Raids.



On Sunday, December 11, 2016 at 2:12:06 PM UTC+5:30, Sanjeev wrote:

Registration Number
MHOME/R/2016/53427

Name
S K Goyal

Date of Filing
11-12-2016

RTI Fee Received
    10

Payment Mode
Credit or Debit Card / RuPay Card

SBI Reference number
116121130923054

Transaction Status
Transaction Successful

Request filed with
Ministry of Home Affairs

As a result of nationwide Income Tax raids on black money hoarders large sums are being recovered in new currency notes. While this large sums are being recovered crores of people are standing in Q wasting their precious time in front of banks to face acute shortage of new currency notes. It is understood that as per legal process the money is not deposited in banks but stored as a proof for producing in court. Now in view of availability of electronic recording this storage may be avoided in larger public interest. In this back ground please inform:
(i)            Whether this new currency so confiscated in raids is stored by Income Tax Department/Police in their warehouse for indefinite period or is being deposited in banks for recirculation among public?
(ii)           In case this is not being deposited in banks who can authorize IT Department or Police to deposit the sum in banks to ease the shortage of new currency notes?

Telephone Number
23093178

Email Id

Information under RTI: Fee Deduction on withdrawal of Admission by Student in University.

Information under RTI: Fee Deduction on withdrawal of Admission by Student in University.



On Sunday, December 11, 2016 at 2:11:03 PM UTC+5:30, Sanjeev wrote:
Registration Number
UGCOM/R/2016/55515
Name
S K Goyal
Date of Filing
11-12-2016
RTI Fee Received
    10
Payment Mode
Credit or Debit Card / RuPay Card
SBI Reference number
116121130906058
Transaction Status
Transaction Successful
Request filed with
University Grants Commission (UGC)
Refer your recent fee refund notification dated 6 Dec 2016. Apparently it has been stated that this has been brought to help students against whimsical deduction of fee & handle non-refund cases by private Universities. As per earlier notification dated 23 April 2007 a deduction of Rs.1000 was applicable for withdrawal of admission before joining course. Even if a student withdraws after joining he was entitled for proportionate refund if sanctioned strength is admitted in the course. However, as per new guidelines there is a minimum deduction of 10% fee University can deduct in the name of processing fee even for withdrawal any time, that too on aggregate fee. For example if a student deposits Rs.50000/- with a University in April to secure admission against a semester fee of Rs.1,50,000/- for session to begin in July. Now if the student withdraws in May - he would face a deduction of R.15,000/- against a sum of Rs.1000 as per earlier rules. The deduction of 10% on aggregate fee is much higher than the earlier amount of Rs.1000/-. The concept of aggregate fee is new one and is totally in favour of University without any rationale. The new system does not specify anything about Hostel fee nor define aggregate fee. Further in new system the student looses 100% money if he withdraws after one month of last date of admission even if the University is operating at above the sanctioned strength. The notification does not specify what will happen if a University admits student even after last date of admission. This is surprising as the new notification starts with the plight of poor student and claims to call it an initiative to safeguard the interest of students and curb the profiteering tendency of private Universities. In the absence of any description to justify the higher deduction the notification is not a speaking one and primarily appears to be highly in the favour of private Universities. In this back ground please inform :

(i)            The justification & rationale recorded in the file noting for notifying this excessive higher deduction applicable on withdrawal of admission by student?
(ii)           What is the meaning of aggregate fee?
(iii)          What if a University takes admission even after declared last date of admission?

Telephone Number
011-23232783
Email Id

Information under RTI: NHAI - Excessive Waiting time on Manesar Toll Plaza.

Information under RTI: NHAI - Excessive Waiting time on Manesar Toll Plaza.



On Sunday, December 11, 2016 at 4:22:28 PM UTC+5:30, Sanjeev wrote:
Registration Number
NHAIN/R/2016/51230
Name
S K Goyal
Date of Filing
11-12-2016
RTI Fee Received
    10
Payment Mode
Credit or Debit Card / RuPay Card
SBI Reference number
116121130981445
Transaction Status
Transaction Successful
Request filed with
National Highways Authority of India (NHAI)
NHAI:

I recent passed through Manesar Toll Plaza on NH-8 coming from Jaipur side on 10th Dec 2016 evening. At toll plaza it took up around 20-25 minutes to pass through as the waiting line was very long. The Q was around half a kilometer. It is understood that as per court orders any toll plaza has to be made free if the length of pile up exceeds certain meters. In this back ground please inform:

(i)             The reference of such court order?
(ii)            What steps has been taken by HNAI to ensure that concessionaire follows such court order?
Telephone Number
011-25074100
Email Id

Dwarka Forum Discussion Group

Latest Posts

Recent Posts Widget